Success Stories

Project Tank Gauging Systems

                                               
                  TANK GAUGING SYSTEM + IRAN 




We have foucosed  to deliver the complete solution in tank gage systems on EMERSON and Endress + Hauser  systems.

Our colleagues in  TGS department , have been trained in the EMERSON and Endress+Hauser companies and over the years of  presence in various industries have  gained very valuable experiences on the tank gauging systems.

We have a strong track record on tank gauging systems in Oil & Gas, Refineries , Export Ports and …
 
 

A number of projects carried out in Ista Kherd Parseh Company regarding Tank Guaging Systems are as follows:

1- Owner: South Pars Gas Complex(SPGC)/Main Contractor : TESCO /Location : Phase of 15 & 16

Description: Pre Commissioning, Commissioning of 9 condensate tanks, Including E+H SERVO, RADAR & TGS panel. Transfer the data with Fiber Optic from TGS Panel to control room for monitoring.

2- Owner: NIOPDC / Main Contractor : NIOPDC /Location : Gorgan

Description:Overall Design, Detail Design, Procurement, Panel Mounting, Programing & Test (FAT) Commissioning (SAT) Including Radar level transmitter, Multi average temperature transmitter, Pressure transmitter, Tank Side Monitor, Tank Scanner …of E+H.

3- Owner: Isfahan Refinery / Main Contractor : Hirbodniroo/ Location : Isfahan

Description: Consultation , procurement ,Pre Commissioning, Commissioning of TGS Systems of 4 extension Storage tanks to 64 existence tanks Including Radar Level Transmitter, Multi temperature, Tank Hub, Tank Master, Monitoring system Of Emerson.

4- Owner: South Pars Gas Complex(SPGC)/ Main Contractor : PPI/ Location : PHASE 13

Description: Pre Commissioning, Commissioning of 4 butane, propane Storage tanks Including Servo Level Transmitter and multi average temperature transmitter of E+H & special Radar level transmitter of EMERSON produced for LPG application, Transfer the data with Fiber Optic from TGS Panel in TGS station to control room for monitoring.

5- Owner: ICIIC / Main Contractor ICIIC/ Location : Isfahan

Description: Consultation, procurement, Installation, Pre commissioning, commissioning of TGS Systems of 5 Floating roof tanks Including Level Transmitter and multi average temperature transmitter, Tank Side Monitor, Tank Scanner of E+H.

6- Owner: Mihangas / Main Contractor :IPS / Location : Tanzania-Dar es Salaam

Description: Consultation, procurement, Installation, Pre commissioning, commissioning of 4 LPG Tanks Including Servo Level Transmitters, Pressure transmitters, Temperature Transmitters of E+H.

7- OWNER: KEPGCO./Main Contractor:KEPGCO/Location:Bandar Imam Khomeini of MAHSHAHR

Description: Pre commissioning, commissioning of Tank gauging system of 9 Tanks.
Including: Radar Level Transmitter, Multi average temperature transmitter, Pressure Transmitter, Tank Side Monitor, and Tank Scanner… of E+ H.

8- OWNER: Esfahan Oil Refinary Co /Main Contractor:MAPNA (NEYR PERSE)/Location:Isfahan


Description: Modification and completion of tank guging system of 57 storgae tanks.
Including: Radar Level Transmitter, Servo Level Transmitter ,Multi average temperature transmitter ,Tank Side Monitor, and Tank Scanner & TGS Cabinet … of E+ H.